We are on the road again. We left this afternoon a little after noon, and we are spending the night at the Lakeside Casino RV park in Osceola, IA (south of Des Moines a bit). We are heading to the Kansas City Regional Quilt Festival, and this is not quite half way. Nice enough, and less noisy than I thought it would be due to a nice berm between the campground and the highway. There is also a nice little pond with a lot of frogs doing their best to mask the highway sounds. I actually remembered to take a picture of our site though it was a little late.
I did finish Callyn’s quilt. It turned out really cute. The flowers are each about 3 1/2” in diameter.
Since we had only been at home a few days, it was easy to pack for this trip except for collecting the supply list for my quilting classes. Why do instructors ask for the impossible? One of my classes wanted 2” painter’s Tape. It turns out that such a thing doesn’t exist, according to the paint store I ended up at after searching all the big box stores. The biggest ones available are just under 2” and almost 3”. I bought the 1.88”. I also had to search for rubber cement. I am taking an intermediate free motion quilting class and a class on appliqué techniques. Ought to be interesting.